Technical Design Report for the Upgrade of the ALICE Time Projection Chamber

B. Abelev, B. Chang, D.J. Kim, J. Kral, Christian Lippmann, A. Mooreale, E.H.O. Pohjoisaho, J. Rak, S.S. Räsänen, W.H. Trzaska, M. Vargyas, J. Viinikainen, The ALICE collaboration, Francisco Ignacio Garcia Fuentes, TPC upgrade collaboration

Tutkimustuotos: Kirja/raporttiTutkimusraporttiAmmatillinen

Abstrakti

An interaction rate of 50 kHz is expected for the Pb-Pb periods after the luminosity upgrade of the LHC during LS2, and the ALICE upgrade plans foresee to operate the experiment at these interaction rates. For this purpose, the MWPC-based TPC readout chambers will be replaced by Gas Electron Multipliers (GEMs), allowing a continuous readout of the TPC. The details of this upgrade are described in this Technical Design Report.
Alkuperäiskielienglanti
KustantajaCERN
PainosCERN-LHCC-2013-020, ALICE-TDR-016
Sivumäärä176
TilaJulkaistu - 3 maaliskuuta 2014
OKM-julkaisutyyppiD4 Julkaistu kehittämis- tai tutkimusraportti taikka -selvitys

Tieteenalat

  • 114 Fysiikka

Siteeraa tätä