TY - JOUR
T1 - Development of the CMS detector for the CERN LHC Run 3
AU - The CMS Collaboration
AU - Hayrapetyan, A.
AU - Tumasyan, A.
AU - Adam, W.
AU - Forthomme, Laurent
AU - Kirschenmann, H.
AU - Österberg, K.
AU - Voutilainen, M.
AU - Bharthuar, Shudhashil
AU - Brücken, Erik
AU - Garcia, F.
AU - Havukainen, J.
AU - Heikkilä, Jaana
AU - Kallonen, Kimmo
AU - Kim, Minsuk
AU - Kinnunen, R.
AU - Koponen, Pirkitta
AU - Kortelainen, Matti
AU - Lampén, T.
AU - Lassila-Perini, K.
AU - Laurila, S.
AU - Lehti, S.
AU - Lindén, T.
AU - Lotti, Mikko
AU - Luukka, P.
AU - Martikainen, Laura
AU - Myllymäki, Mikael Erkki Johannes
AU - Pekkanen, Juska
AU - Rantanen, Milla-Maarit
AU - Siikonen, H.
AU - Tuominen, E.
AU - Tuominiemi, J.
AU - Turpeinen, Raimo
AU - Viinikainen, Jussi
AU - Petrow, H.
AU - Tuuva, T.
PY - 2024/5/23
Y1 - 2024/5/23
N2 - Since the initial data taking of the CERN LHC, the CMS experiment has undergone substantial upgrades and improvements. This paper discusses the CMS detector as it is configured for the third data-taking period of the CERN LHC, Run 3, which started in 2022. The entire silicon pixel tracking detector was replaced. A new powering system for the superconducting solenoid was installed. The electronics of the hadron calorimeter was upgraded. All the muon electronic systems were upgraded, and new muon detector stations were added, including a gas electron multiplier detector. The precision proton spectrometer was upgraded. The dedicated luminosity detectors and the beam loss monitor were refurbished. Substantial improvements to the trigger, data acquisition, software, and computing systems were also implemented, including a new hybrid CPU/GPU farm for the high-level trigger.
AB - Since the initial data taking of the CERN LHC, the CMS experiment has undergone substantial upgrades and improvements. This paper discusses the CMS detector as it is configured for the third data-taking period of the CERN LHC, Run 3, which started in 2022. The entire silicon pixel tracking detector was replaced. A new powering system for the superconducting solenoid was installed. The electronics of the hadron calorimeter was upgraded. All the muon electronic systems were upgraded, and new muon detector stations were added, including a gas electron multiplier detector. The precision proton spectrometer was upgraded. The dedicated luminosity detectors and the beam loss monitor were refurbished. Substantial improvements to the trigger, data acquisition, software, and computing systems were also implemented, including a new hybrid CPU/GPU farm for the high-level trigger.
KW - 114 Physical sciences
U2 - 10.1088/1748-0221/19/05/P05064
DO - 10.1088/1748-0221/19/05/P05064
M3 - Article
SN - 1748-0221
VL - 19
JO - Journal of Instrumentation
JF - Journal of Instrumentation
IS - 5
M1 - P05064
ER -